Clarity over ceremony

Project scope estimator

It is hard to plan anything without a sense of size. Tick what your project needs and get an honest indication of how big it is and how long it usually takes.

Use the tool

What it is
What it does
What it has to respect
Pick what applies

Nothing selected yet. Tick a few things above and the estimate fills in.

A rough indication to start a conversation, not a quote. Every project gets a real scope before anything is agreed.

Good to know

How to read the result

  • Why there is no price

    A number without a conversation would be a guess dressed up as a quote. What a project costs depends on what it has to do, not on how many boxes you tick.

  • What moves the estimate most

    Integrations, payments and anything touching sensitive data add the most, because they bring other people's systems and rules along with them.

  • What happens next

    In a real project we frame the problem first, then scope it properly. That conversation is free and usually changes the shape of the idea for the better.

More tools

Try another one

  • Brand theme card Design
    Brand theme card

    Try a palette on a real card, in light and dark.

    Open tool
  • Contrast checker Design
    Contrast checker

    Check any two colours against the WCAG accessibility levels.

    Open tool
  • Passphrase generator Security
    Passphrase generator

    Generate a strong passphrase you can actually remember.

    Open tool

Need something these can't do?

These are the small ones. The bigger ones we develop for the people who ask.

Tell us what you need